Land investments

Forest Maps in Greece: What to Check Before Buying Land

What the Greek forest map shows, how to check a plot online, what papers the contract needs and what happens if part of a Kefalonia plot is forest.

8 min readupdated 9 November 2026

Green hillside with scrub and a view of the bay in Kefalonia
Contents

Before you buy land in Kefalonia, check the forest map to see whether all or part of the plot is classified as forest. Land classified as forest cannot be built on, and a sale of forest land on a ratified forest map is void without a certificate from the Forest Directorate. You can check online, and your engineer confirms the result before the preliminary contract.

This guide is general information, not legal advice. For a specific plot, your engineer confirms the classification and your lawyer the legal side. It is part of our guide to buying land in Kefalonia.

What does the forest map show?

The forest map shows the character of the land: whether an area is forest or forest land, grassland, rocky or stony ground, or some other form of land (farmland, for example). It does not show who owns it. Ownership is decided separately, through the title deeds and the Hellenic Cadastre.

Each area on the map carries a two-letter code. The first letter reflects older aerial photos and the second recent ones:

CodeWhat it meansWhat it means for a buyer
ΑΑOther land, then and nowOutside forest law
ΔΔForest or forest land, then and nowForest land
ΔΑForest then, other land now (e.g. cleared)Forest land
ΑΔOther land then, forest now (e.g. abandoned field)Forest land, with special rules
ΧΧ, ΧΑ, ΑΧGrassland in one or both periodsSpecial status, ask your engineer
ΠΔ, ΠΑ, ΠΧA final classification act already exists (forest, non-forest, grassland)The act applies
ΑΝDeclared for reforestation or afforestationProtected, ask your engineer

The table is a simplification. What applies to a specific polygon is for your engineer to say, based on the map and any acts that exist for it.

Where does the Kefalonia forest map stand?

The forest map for the whole area of the Kefalonia Forest Directorate was posted on 15 January 2021, and the 2022 list of ratified forest maps includes Kefalonia (Government Gazette Δ΄ 707/2022). The deadline for objections to that posting has passed.

Ratification does not necessarily cover every spot. Sections with pending objections stay outside the ratification until they are decided. So your engineer checks not only the code but also whether that exact spot is ratified.

Much of the island is mountainous and green, and Mount Ainos has been a national park since 1962. A sea view from a hillside of scrub and pines is exactly the kind of plot to check before you commit.

How do I check a plot on the forest map?

The map is public on the Hellenic Cadastre's "Forest Maps Posting" service. You find the area by place name or by coordinates, and the "land type information" tool shows the code.

For a first look, the location from the listing is enough. To decide, though, you need the corner coordinates of the plot (in the Greek ΕΓΣΑ 87 system) from a survey plan. At the edge of a polygon, a few metres make the difference. Ask the seller for the survey plan and give it to your engineer.

Valley with cypresses and olive trees in inland Kefalonia

Olives, cypresses and scrub in the same valley: on land like this the forest map shows the character of each piece. Photo: Ilias Byron Ladenis, CC BY-SA 4.0, via Wikimedia Commons.

What papers does the contract need?

This is set by article 20 of Law 3889/2010, last amended by article 93 of Law 5299/2026 (Government Gazette Α΄ 67, 5 May 2026). There are three cases:

  1. The plot is not forest. The engineer signs a solemn declaration (article 8 of Law 1599/1986) that the property does not fall under forest law. It is written on the survey plan attached to the contract, or on an extract of the forest map showing the property's coordinates.
  2. The plot is forest on a ratified map. The transfer is void unless it comes with a certificate from the competent Forest Directorate on the character of the land.
  3. An objection or correction request was accepted, but the map has not yet changed. The contract must attach, on pain of nullity, the decision (with its Diavgeia reference number) and a survey plan in ΕΓΣΑ coordinates, on which the engineer certifies that it is the same property.

The notary must attach these documents and mention them in the deed. Without them, the deed cannot be registered with the Cadastre.

Part of the plot is forest: can I buy only the rest?

This is the most common buyer question. Two rules help:

  • Selling only the non-forest part. Article 153 of Law 4819/2021 allows the non-forest part of a property that also has a forest section to be transferred without counting as a subdivision.
  • A building permit on the ΑΑ part. A permit can be issued on the section coded ΑΑ, if that section alone meets the minimum size and building conditions.

In practice, measure what is left once you take out the forest part. A 6,000 m² rural plot with 2,500 m² of forest has 3,500 m² net, less than the 4,000 m² that land outside the town plan generally needs. See how that rule works in our guide to inside vs outside the town plan.

Watch the access too. If the only way in from the road crosses a forest strip, a ramp or entrance there falls under forest law. Ask your engineer before the preliminary contract whether access can be solved lawfully.

The objection deadline has passed. Can a map error still be fixed?

Yes, if it is an obvious error. Since Law 4964/2022, even a ratified forest map can be corrected for obvious errors, such as a wrong boundary, a field mapped as forest, or an artificial plantation recorded as natural forest. The request goes to the Forest Directorate, with no filing fee. If it is approved, a new ratification decision is published in the Government Gazette.

New objections to a ratified map are not allowed. And a correction request changes nothing while it is pending.

For a buyer: do not buy on the promise that "it will be corrected". If the seller has applied, ask for it to be completed before the final contract, or have your lawyer make approval a condition in the preliminary contract.

Who does the check, and when?

Your engineer, before the preliminary contract. They check the code, whether the spot is ratified, whether there are classification acts or committee decisions, and how much net area is left. Your lawyer checks the title deeds, because the forest map does not answer who owns the land. The notary attaches the documents to the deed. More on each role in our guide to the professionals you need.

The plots on our page of land for sale in Kefalonia are listings. Your own engineer confirms the forest status of each plot. PlotX charges a 1% platform fee, paid by the buyer only.

Frequently asked questions

Does the forest map show who owns the land? No. It shows only the character of the land. Ownership is decided by the title deeds and the Cadastre.

Can land classified as forest be built on? No. If the plot also has a non-forest section, a permit can be issued only there, provided that section alone meets the minimum size.

How much does a request to correct an obvious error cost? There is no filing fee. You do pay the engineer for the file (survey plan, coordinates, technical report).

What if there is already a house on forest land? There is a special scheme for homes on forest land (article 52 of Law 4685/2020), with exclusions, for example buildings built after 28 July 2011. The scheme suspends demolition; it does not legalise the house. If you are offered such a property, ask your lawyer and engineer for a written view before anything else.

Can I check the map myself from abroad? Yes, for a first look, on the Cadastre's service. To decide, you need an engineer with the plot's coordinates.

Sources

Read PlotX often?Add PlotX as a preferred source on Google

Plots for sale in Kefalonia

See all

Find property with transparency

Browse PlotX listings with clear facts and no hidden fees.

View properties

Related articles